Applications & Information

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Hardscape/Drainage Permit

Required if 500sf or more of new and/or removed and replaced impervious surface is proposed. A permanent post construction structural BMP such as a bioretention basin or biofiltration basin shall be provided to collect and treat all runoff generated by the new and/or removed and replaced impervious surfaces prior to discharge from the site. Additionally, a landscape area may be designed and/or designated and utilized as a permanent post-construction BMP area.

Complete or gather the following forms and save to your computer or device. You will upload these items when you apply through Customer Self Service (CSS):


Return to All Applications & Information »

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer