City of Encinitas
Home Menu
CLOSE
Welcome to the City of Encinitas!
POPULAR SEARCHES
Engineering CIP References & Resources
General, Strategic & Master Plans
- General Plan
- City Council Annual Work Plan (FY 25/26)
- Climate Action Plan (CAP)
- Housing Element
- Mobility Element
- Parks, Beaches, Trails and Open Space Masterplan (2016)
- Specific Plans, Codes & Guidelines
Enterprise Funds
Bridges & Pavement
Drainage Studies
- Leucadia Area Watershed Drainage Feasibility Study (Dec. 2022)
- Leucadia Roadside Park Stormwater Improvement Project – Preliminary Engineering Report (Aug. 2017)
- Gray vs Green Infrastructure Solutions for Vulcan Ave./Union St./Orpheus St./Encinitas Blvd. Drainage Improvements (Dec. 2015)
- Cottonwood Creek Watershed LID Retrofit Plan – (Apr. 2015)
- Hydrologic and Hydraulic Study for Leucadia Drainage Improvement Alternatives (June 2004)
- Hydrologic and Hydraulic Study for Coast Highway 101 Interim Storm Drain Improvements (Nov. 2003)
- Cottonwood Creek/Moonlight Beach Facilities & Cost Benefit Analysis (May 2003)
- Cottonwood Creek/Moonlight Beach Hydrology & Facilities Analysis Summary (Apr. 2003)
- Hydrologic and Hydraulics Study - N. Hwy 101 Streetscape (Marcheta St. - Basil St.) (Aug. 2020)
- Hydrologic and Hydraulics Study - N. Hwy 101 (Basil St. - La Costa Ave.) (April 2020)
Mobility Studies
- ADA Transition Plan (2019/2020)
- ADA Transition Plan (2019/2020)
- Active Transportation Plan (ATP) (2018)
- Bikeway Master Plan Update (2005)
- Coastal Mobility & Livability Study (CMLS)
- Let's Move, Encinitas! Pedestrian Travel and Safe Routes to School Plan (Feb. 2015)
- Modal Alternatives Project (MAP)
- Modal Alternatives Project (MAP) Implementation Plan (Feb. 2023)
Rail Studies
- Cross Connect Implementation Plan (Dec. 2020)
- Encinitas Quiet Zone Feasibility Analysis (Aug. 2019)
- Rail Corridor Vision Study Report (Feb. 2018)
- Rail Corridor Vision Study Appendix (Feb. 2018)
- Birmingham Drive Grade Separation Study (Feb. 2014)
- Encinitas Grade Separated Pedestrian Crossings Study (June 2006)
- Leucadia Blvd. and Rail Corridor Grade Separation Study (Jan. 2006)
- Rail Corridor Trenching/Relocation Conceptual Project Analysis/Appendix (Jan. 2001)
Traffic Studies
- Encinitas Local Roadway Safety Plan (LRSP) (Feb. 2022)
- La Costa Ave. Traffic Analysis (Nov. 2021)
- Rancho Santa Fe Road Corridor Study (Apr. 2021)
- Traffic Impact Study – 2014-2021
